Two one-minute runs takes over two hours to orchestrate. Most of the time is spent transporting and moving around the 400lb sleds. I'm telling you these people are all basically professional weight lifters. After sliding we load the sleds into trucks (they have loading docks at the start and finish of the runs) and take them back to the shed. Then we flip them over, propping up the nose, before taking care of the runners. We remove the nuts and loosen the bolts and dry and sharpen (with sandpaper) the runners. And then we're back to the OTC in time for lunch.
0 Comments:
Post a Comment
<< Home